Evaluation of a Prestressed Concrete Bridge Constructed using Ultra High-Performance Concrete Evaluation of a Prestressed Concrete Bridge Constructed using Ultra High-Performance Concrete Evaluation of a Prestressed Concrete Bridge Constructed using Ultra High-Performance Concrete

Research Project

divider

Evaluation of a Prestressed Concrete Bridge Constructed using Ultra High-Performance Concrete

Researcher(s)

Principal investigators: Sri Sritharan, 515-294-5238, sri@iastate.edu (project list)
CCEE, Iowa State University
Terry Wipf, 515-294-6979, tjwipf@iastate.edu (project list)

Co-principal investigators:

Student researcher: Brian Degen

Project status

Completed

Start date: 07/01/03
End date: 12/31/06

Publications

Related publications:

*To read pdf files, you may need to download the free Adobe Acrobat Reader.

Sponsor(s)/partner(s)

Sponsor(s): Wapello County, Iowa

About the research

Abstract:

Evaluate the innovative material performance and preliminary engineering of a bridge in Wapello County constructed of ultra-high performance concrete.

2711 S. Loop Drive, Suite 4700, Ames, Iowa 50010-8664
Phone: 515-294-9501 ~ Fax: 515-294-0467
The Bridge Engineering Center is administered by Iowa State University's Institute for Transportation.

Bridge Engineering Center logo

Timber Bridge Program Structural Health Monitoring Current Projects Completed Projects About BEC Staff Students Related Links

Iowa State University logo and link