Accelerated Bridge Construction Approaches for Bridge Rehabilitation Accelerated Bridge Construction Approaches for Bridge Rehabilitation

Research Project

divider

Accelerated Bridge Construction Approaches for Bridge Rehabilitation

Researcher(s)

Principal investigators: Brent Phares, 515-294-5879, bphares@iastate.edu (project list), Iowa State University
Terry Wipf, 515-294-6979, tjwipf@iastate.edu (project list)

Project status

In progress

Start date: 03/18/14
End date: 09/30/17

Publications

Report: December 2015, Synthesis on the Use of Accelerated Bridge Construction Approaches for Bridge Rehabilitation 2.42 mb (*pdf)

*To read pdf files, you may need to download the free Adobe Acrobat Reader.

Sponsor(s)/partner(s)

Sponsor(s): University Transportation Center for Accelerated Bridge Construction
USDOT/OST-R

About the research

Research objective:

Accelerated bridge construction (ABC) has received significant research attention in recent years. For the most part, these research endeavors have focused on means and methods for decreasing impact to the traveling public during new bridge construction. At the same time, great opportunities exist to further reduce traffic impacts by decreasing construction time associated with bridge repair and rehabilitation.

Most bridges undergo several small and one or two major rehabilitations during their useful lives and decreasing the traffic impacts during these events could have significant societal benefits. Fortunately, many of the new construction concepts may be able to be adapted for use in rehabilitation scenarios. In still other cases, new means and methods may be needed.

This research completes a synthesis of available rehabilitation alternatives and solutions that could be used by practitioners to complete rapid rehabilitation projects. In some cases, these alternatives are adaptations of new construction methods and, in others, they are strictly for rehabilitation activities.

This synthesis provides a comprehensive summary of available solutions.

2711 S. Loop Drive, Suite 4700, Ames, Iowa 50010-8664
Phone: 515-294-9501 ~ Fax: 515-294-0467
The Bridge Engineering Center is administered by Iowa State University's Institute for Transportation.

Bridge Engineering Center logo

Timber Bridge Program Structural Health Monitoring Current Projects Completed Projects About BEC Staff Students Related Links

Iowa State University logo and link